Daily Production Report
The Daily Production Report (DPR) is how a supervisor tells Bizconnekt what a station made in a shift. You pick the station and the shift, type the good and bad pieces for each product, and submit. Bizconnekt then shares that output across the station's started work orders, takes the materials out of stock and puts the finished pieces in. You do not open each work order or each stage.
Video coming soon: Daily Production Report in 2 minutesWhere it fits
A station is a machine or facility. The work orders that run on it are planned and started in Work Order. When you report a shift, each product you enter is posted against those started work orders, those with material on hand first and then the earliest due. Each posting creates a job card with its own stock movement, so the result is the same as if you had run the stage on the work order yourself.
If a line cannot post yet, for example because material has not arrived or a work order has not started, Bizconnekt keeps it and posts it by itself when it can. The report shows you where every line stands.
What you can do
The screens
| Screen | What it is for |
|---|---|
| Add DPR | Enter a shift's output. See Enter a report. |
| View | Every report so far, with its lines opened beside the list. |
| Needs you | Lines that have not posted yet and are waiting on someone. |
| Station week | One week at a glance, stations down the side, days across. |
| Before closing books | Decide what happens to unposted lines before you close a period. Shown to admins only. |
The four tabs are described in Follow and fix lines.
Why you may not see it
Daily Production Report is switched on for each business unit separately. Until it is, the DPR row does not appear under Production in the left menu and nobody can enter a new report.
A Bizconnekt staff member switches it on in the Bizconnekt Admin portal. In Subscription, open the business, find its Business Unit Management section and tick Daily Production Report on the Feature Flags tab for that business unit. You cannot turn it on yourself. To have it switched on, contact support at support@bizconnekt.com and name the business unit.
Once it is switched on, your role also needs access (see below). If it is switched off again later, the lines already submitted keep posting, and you can still open reports and withdraw, retry or reverse lines. You just cannot enter new ones.
Who can use it
| You want to | What your role needs |
|---|---|
| Open the DPR screens | View on Daily Production Report |
| Enter a report; submit, remove, retry, withdraw or reverse a line | Edit on Daily Production Report |
| Report for an earlier day | Back-date Production, as well as Edit |
| Choose which lots a line draws, and see the shortages behind a waiting line | Access to production costing |
| Open the job cards a line created | View on Job Card |
| Use Before closing books | A tenant admin or root admin |
A station can have a list of supervisors. If it does, only those people can enter reports for it. If the list is empty, anyone with Edit on Daily Production Report can. The list is the Supervisors field on the station, set under Resources. If you see "No station is open to you", ask an admin to list you as a supervisor.
If your role only lets you see records you created, you can change only the lines you entered yourself.
Line states
Every line you submit has a state, shown as a coloured tag.
| State | Means |
|---|---|
| Saved, not submitted | Entered but not sent. You can submit or remove it. |
| Posting… | Being shared across the station's started work orders. |
| Waiting for material | Not enough material at the station's location. It posts by itself when material arrives, or when stock is freed. |
| Waiting for a work order | No started work order makes this product here yet. It posts by itself once one is started. |
| Waiting for inspection | Posts by itself once the stage's inspection is decided. |
| Waiting: books closed | The books are closed for that day. An admin decides whether to post it on the first open day or withdraw it. |
| Needs you | It could not be posted. The tag says why. Withdraw it or retry. |
| Posted | Done. A partly reversed line stays Posted and says, for example, "2 of 10 reversed". |
| Reversed | Fully taken back. |
| Withdrawn | Cancelled before posting. Nothing was posted. |
On mobile
The mobile app has a Daily Production Report row under Production, with the same four tabs and a + button to enter a shift. It also keeps an entry on the phone when you have no signal and sends it when you are back online. See Enter a report and Follow and fix lines.
Same on iPhone and Android. The Android app is on Google Play. The iPhone app is coming soon to the App Store.